Linde Engineering
Case Study
Integrated Cost Center Planning Meets Engineering Excellence
Controlling and planning (costs, personnel, and capacity) for over 300 cost centers is highly complex. As requirements have grown over time, Linde Engineering’s planning process using Excel had lost much of its flexibility and efficiency.
After a period of evaluation, the plant engineering company therefore decided to implement Board for cost center planning. Within a very short time, the financial controlling department was able to put the Board solution into productive use for top-down planning.
Please click here for the English version:
The Facts at a Glance
Industry:
Plant Engineering
Topic:
Cost Center Planning
Software:
Board
Software:
No items found.
Requirement:
Planning for more than 300 cost centers pushed Excel to its limits. The company sought a flexible solution that would restore consistency between headcount, capacity, and cost planning.
Implementation:
Development of a multidimensional cost center planning system that also enables the simulation of cost allocations, internal activity-based costing, and hourly rate calculations.
Advantages and Benefits
- A Better Overview of the Cost Structure
- Dynamic Simulation Models
- Flexible planning down to the finest details
- Huge time savings

This newfound flexibility and agility with Board is also reflected in our overall collaboration with celver AG. From tool evaluation to process mapping—which made our specific planning requirements transparent in the first place—all the way to fast and reliable implementation—all of this has convinced us that we’ve found the right tool with the right partner.
